Twitter Facebook LinkedIn YouTube

Experience

Rainwater Harvesting

Return to the Rainwater Harvesting Index Slide (Slide #1)


  • Rainwater Harvesting

    Project(s) Overview:

    1. Rainwater Harvesting Index
    2. Calgary Water Centre
    3. South Health Campus, Calgary
    4. CrossIron Mills Shopping Centre
    5. Robbins HCLC MacEwan College City Centre Campus
    6. South Health Campus

    - FURTHER NAVIGATION -

    Click the numbered tabs at the bottom left or the left/right arrows to the side.
  • Water Centre

    Calgary, AB 2005 - 2008

    Project Overview:

    Calgary Water Centre is the new home for The City of Calgary Water Resources business unit. The building is an architectural award winner and an anchor for the Manchester Yards redevelopment area overlooking the Elbow River and Stampede Park. Calgary Water Centre is a LEED®-NC Platinum-level candidate project.

    More Information:

    Full Project Sheet (PDF)
  • South Health Campus

    Calgary, AB 2008 - 2012

    Project Overview:

    ion modelled the irrigation requirements for the 2 hectares of site landscaping plus 2 hectares of potential green roofs. The 30-year life cycle cost savings presented by rainwater harvesting for irrigation was estimated as $1,500,000 dollars. Irrigation on the Main Campus and adjacent East Site support building will be managed by an onsite weather station and satellite controllers communicating on the Campus LAN.

    More Information:

    Contact us for more info...

  • CrossIron Mills Shopping Centre

    Balzac, AB 2006 - 2009

    Project Overview:

    CrossIron Mills Shopping Centre is the first development to be constructed within the ‘East Balzac Retail & Racing Entertainment Centre’. No potable water is permitted for outdoor watering in the rural jurisdiction due to infrastructure constraints.

    More Information:

    Full Project Sheet (PDF)

  • Robbins HCLC MacEwan College City Centre Campus

    Edmonton, AB 2005 - 2006

    Project Overview:

    The Robbins Health Care Learning Centre is the second LEED®-NC building with an irrigation system designed by ion for MacEwan College. ion worked in a multidisciplinary P3 team to design, administer construction and attain coveted water efficiency credits required for the building rating application.

    More Information:

    Full Project Sheet (PDF)

  • South Health Campus

    Calgary, AB

    Project Overview:

    ion was retained in 2008 for full service irrigation consulting after the fast-track project was well underway. The deliverable was a conventional pop-up sprinkler system. However, the project was one of the first low impact development projects in Calgary with a stormwater collection system comprised of 5 massive underground cast-in-place cisterns.

    More Information:

    Full Project Sheet (PDF)


Ion Irrigation Management Inc.
2432 - 91 Ave. S.E.
Calgary, Alberta T2C 5H2
Google Places Link
Site by illuminart inc.